Retrieving RFP details
Release
Close
California Department of Transportation
Hma, rhma, jpcp, jpcp(rsc), and individual slab replacement (rsc).
07-363204sp
California Department of Transportation
Rdwy Exc, CRCP, JPCP, HMA, Temp barrier system, and aggregate subbase.
California Department of Transportation
Work consists of culverts restoration, rhma, jpcp, isr, barrier, landscape, electrical, includes, 320 sf of temporary pavement marking; 49,500 LF of temporary traffic stripe; 114,000 LF of temporary railing (type k); 24,500 LF of temporary fiber roll; 240 LF of temporary gravel bag berm; 36,600 LF of remove yellow thermoplastic traffic stripe (hazardous waste); 31 CY of remove concrete; 1,630 LF of temporary protection fence (rope); 17,400 CY of roadway excavation; 122,000 SY of weed germination; 5,110 CY of wood mulch; 942,000 sf of hydroseed; 13,400 SY of base bond breaker; 2,630 SY of high friction surface treatment; 23,800 TON of rubberized hot mix asphalt (gap graded); 3,030 TON of hot mix asphalt; 82 TON of tack coat. See outside link.
California Department of Transportation
9 ea portable changeable message sign (ea); 4,050 CY roadway excavation; 9 ea plant (group f); 2 ea 1 1/2" remote control valve; 3" gate valve; 250 CY class 2 aggregate base (cy)
Release
Oct 27, 2025
Close
Dec 18, 2025