Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
California Department of Transportation
Remodel the caltrans district 6 lab office facility.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Fox Valley Technical College
Remodel three classroom spaces and one lab space for the interior design program at the main campus. This project will modernize and update these outdated spaces. The work will include general trades, electrical, HVAC, ceilings, painting, and flooring.
Posted Date
Nov 3, 2025
Due Date
Dec 2, 2025
Release: Nov 3, 2025
Fox Valley Technical College
Close: Dec 2, 2025
Remodel three classroom spaces and one lab space for the interior design program at the main campus. This project will modernize and update these outdated spaces. The work will include general trades, electrical, HVAC, ceilings, painting, and flooring.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Waunakee Utilities Office
The Project consists of the remodel of the existing reception area, installation of a new bullet resistant baffle window and tray, new access to the existing office area, remodel of the existing office area (approx. 700 SF), and new interior carpet (approx.3,200 SF).
Posted Date
Nov 21, 2025
Due Date
Dec 19, 2025
Release: Nov 21, 2025
Waunakee Utilities Office
Close: Dec 19, 2025
The Project consists of the remodel of the existing reception area, installation of a new bullet resistant baffle window and tray, new access to the existing office area, remodel of the existing office area (approx. 700 SF), and new interior carpet (approx.3,200 SF).
AvailableUniversity Of Nevada Las Vegas
Work includes interior tenant improvement on the 3rd floor of an existing science research and education facility, sprinklered throughout. Scope includes the addition of two (2) new rooms within an existing research lab, and modifications to an existing clean lab including mechanical, electrical and plumbing improvements.
Posted Date
Oct 20, 2025
Due Date
Dec 3, 2025
Release: Oct 20, 2025
University Of Nevada Las Vegas
Close: Dec 3, 2025
Work includes interior tenant improvement on the 3rd floor of an existing science research and education facility, sprinklered throughout. Scope includes the addition of two (2) new rooms within an existing research lab, and modifications to an existing clean lab including mechanical, electrical and plumbing improvements.
AvailableAlachua County
The scope of work contained in this project is limited to the interior remodeling of the vacated medical offices. Removal and replacement of flooring and ceiling and the removal of the common wall between spaces. None of the life safety exiting requirements will be disturbed and the existing fire sprinkler system, medical, electrical, and plumbing systems will be altered to reflect the proposed wall changes.
Posted Date
Jun 11, 2025
Due Date
Dec 3, 2025
Release: Jun 11, 2025
Alachua County
Close: Dec 3, 2025
The scope of work contained in this project is limited to the interior remodeling of the vacated medical offices. Removal and replacement of flooring and ceiling and the removal of the common wall between spaces. None of the life safety exiting requirements will be disturbed and the existing fire sprinkler system, medical, electrical, and plumbing systems will be altered to reflect the proposed wall changes.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →