Retrieving RFP details
Release
Close
North Texas Tollway Authority
Bridge joint seal replacement for main lane and direct connector bridges road to mainline. Remove and replace existing bridge deck joint seals and reseal approach slab expansion joints. Repair damaged bridge deck joints and damaged concrete adjacent to bridge and approach joints at select locations.
B2500000995
zip
Illinois Department of Transportation
Work includes 444 SY hot-mix asphalt surface removal - butt joint; 130 ton hot-mix asphalt surface course, IL-9.5, mix "D", N70; 16 SY protective coat; 719 SY hot-mix asphalt surface removal, 1/4"; 147 SF relief joint 3"; 16. 4 CY concrete superstructure; 980 pound reinforcement bars, epoxy coated; 171 SF preformed joint strip seal; 388 SF combination concrete curb and gutter, type B-6. 24; 559 SY bridge deck latex concrete overlay, 2 3/4"; 559 SY bridge deck scarification 3/4"; 46 SF structural repair of concrete (depth equal to or less than 5").
Illinois Department of Transportation
Work includes 3,138' pavement marking blackout tape, 5"; 28 cal da. Changeable message sign; 668' short term pavement marking; 2,877' paint pavement marking - line 4"; 3,058 SY bridge deck grooving (longitudinal); 3,986 SY bridge deck fly ash or ggbf slag concrete overlay, 2 1/2"; 3,986 SY bridge deck scarification 3/4"; 84 SF structural repair of concrete (depth equal to or less than 5"); 38 SY deck slab repair (full depth, type I); 20 SY deck slab repair (full depth, type II); 3,598 SY diamond grinding (bridge section).
Massachusetts Department of Transportation
Work includes infrastructure building and surfacing and paving services and bridge construction and repair service.
Release
Oct 17, 2025
Close
Nov 20, 2025