Retrieving RFP details
Release
Close
Illinois Department of Transportation
Work includes 3,138' pavement marking blackout tape, 5"; 28 cal da. Changeable message sign; 668' short term pavement marking; 2,877' paint pavement marking - line 4"; 3,058 SY bridge deck grooving (longitudinal); 3,986 SY bridge deck fly ash or ggbf slag concrete overlay, 2 1/2"; 3,986 SY bridge deck scarification 3/4"; 84 SF structural repair of concrete (depth equal to or less than 5"); 38 SY deck slab repair (full depth, type I); 20 SY deck slab repair (full depth, type II); 3,598 SY diamond grinding (bridge section).
Illinois Department of Transportation
Work includes 970 SY bridge deck grooving; 274 SY hot-mix asphalt surface removal, 1 1/2"; 1,021 SY protective coat; 6 EA. temporary rumble strips; 90 CAL. Da changeable message sign; 500' relocate temporary concrete barrier; 1,400' modified urethane pavement marking - line 5"; 2,600 SF pavement marking removal - grinding; 49 SY partial depth removal, type II, 2.5"; 7 ton partial depth patching; 274 SY bridge deck scarification 1"; 747 SY bridge deck scarification 2 1/2"; 1,021 SY bridge deck microsilica concrete overlay 2 1/2"; 191 SY deck slab repair (full depth, type II).
Indiana Department of Transportation
Approx. 60 CY Excavation, common; 800 SY milling, transition; 1,845 SY asphalt for tack coat; 180 LF guardrail, mgs w-beam, 6 ft 3 in. Spacing; 58 SY sodding; 2.20 CY concrete, C, superstructure; 415 SF bridge deck patching, full depth; 920 SY bridge deck overlay, latex modified; 100 SF bridge deck patching, partial depth. See attache file.
Indiana Department of Transportation
Bridge deck overlay - continuous steel girder & bridge coating - steel girder.
Release
-
Close
Nov 07, 2025