Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
3.22 mi. Patching, resurfacing and traffic signals. Approx. 22.500 AC mowing; 26 SY Portland cement concrete base course 12"; 250,108 P polymerized bituminous materials (tack coat); 488 SF Portland cement concrete sidewalk 4"; 2,038 ft steel plate beam guardrail, type A, 6 foot posts; 11,355 ft short term pavement marking. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
2.4 mi. of Patching, milling, and resurfacing. Approx. 151,287 P polymerized bituminous materials (tack coat); 684 SY hot-mix asphalt shoulders, 6"; 30 CAL DA changeable message sign; 13,222 ft short term pavement marking; 194,995 ft modified urethane pavement marking - line 4". See outside link.
Posted Date
Dec 9, 2025
Due Date
Jan 16, 2026
Release: Dec 9, 2025
Close: Jan 16, 2026
2.4 mi. of Patching, milling, and resurfacing. Approx. 151,287 P polymerized bituminous materials (tack coat); 684 SY hot-mix asphalt shoulders, 6"; 30 CAL DA changeable message sign; 13,222 ft short term pavement marking; 194,995 ft modified urethane pavement marking - line 4". See outside link.
Premium
Access the largest public sector contact database
Work includes installation of traffic signals.
Posted Date
Nov 24, 2025
Due Date
Dec 18, 2025
Release: Nov 24, 2025
Close: Dec 18, 2025
Work includes installation of traffic signals.
AvailableHis project involves rebuilding 7 traffic signals and replacing 5 lane control span wire signals with mast arms, along with modifications to curb ramps.
Posted Date
Nov 19, 2025
Due Date
Dec 17, 2025
Release: Nov 19, 2025
Close: Dec 17, 2025
His project involves rebuilding 7 traffic signals and replacing 5 lane control span wire signals with mast arms, along with modifications to curb ramps.
AvailableTraffic Signals Flashing Yellow Arrow Upgrades 2025. Project consists of upgrading the traffic signal equipment at thirteen (13) intersections to add flashing yellow arrow displays for the left turn movement as required.
Posted Date
Nov 28, 2025
Due Date
Dec 18, 2025
Release: Nov 28, 2025
Close: Dec 18, 2025
Traffic Signals Flashing Yellow Arrow Upgrades 2025. Project consists of upgrading the traffic signal equipment at thirteen (13) intersections to add flashing yellow arrow displays for the left turn movement as required.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis