Discover Opportunities months before the RFP drops
Learn more →Retrieving contract details... Hang tight!
See what competitors charge and their contract structure
Spot renewal opportunities 6-12 months before expiration
Analyze buyer's purchasing history and vendor preferences
Track expiration dates across all your target accounts
Reach decision-makers before renewal with competitive intel
Our customers win 3x more contract renewals and replacements
Premium
Clean & enrich your CRM automatically
Premium
Get complete source documentation & analysis
This contract includes 1 purchase order from Aug 27, 2025 to Aug 27, 2025
| Buyer | Vendor | Issued Date | Quantity |
|---|---|---|---|
| Department of Defense | SUPPLY SOLUTIONS INTERNATIONAL, INC. | Aug 27, 2025 | 1 |
Full Purchase Intelligence Available
Get complete pricing, descriptions, and financial details for all 1 purchase orders
Unlock Full Details →See what competitors charge and their contract structure
Spot renewal opportunities 6-12 months before expiration
Analyze buyer's purchasing history and vendor preferences
Track expiration dates across all your target accounts
Reach decision-makers before renewal with competitive intel
Our customers win 3x more contract renewals and replacements
No public files available for this contract.
Contract documentation may be available through official government sources or agency portals. Starbridge can help you track down and retrieve these files.
REMOVE ALL EXISTING DATA AND PHONE CABLING AS SHOWN IN ATTACHED DRAWING TO THE DATA CLOSETS. BLANK OUT THE PATCH PANEL PORTS TO THE CORRESPONDING CABLING FOR FUTURE USE. INSTALL A 48-PORT CAT6A PATCH PANEL IN DATA CLOSET 2310 IN BUILDING 2. RUN 50 NE
Effective Date
Sep 23, 2025
Expires
Expires:
REMOVE ALL EXISTING DATA AND PHONE CABLING AS SHOWN IN ATTACHED DRAWING TO THE DATA CLOSETS. BLANK OUT THE PATCH PANEL PORTS TO THE CORRESPONDING CABLING FOR FUTURE USE. INSTALL A 48-PORT CAT6A PATCH PANEL IN DATA CLOSET 2310 IN BUILDING 2. RUN 50 NE
ActiveTHE CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, MATERIALS, SUPPLIES, SUPERVISION, AND TRANSPORTATION NECESSARY FOR BLACKFEET RESERVATION APARTMENT COMPLEX IN ACCORDANCE WITH THE ATTACHED SCOPE OF WORK, SPECIFICATIONS, TECHNICAL PROVISIONS, DRAWING
Effective Date
Nov 22, 2022
Expires
Effective: Nov 22, 2022
THE CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, MATERIALS, SUPPLIES, SUPERVISION, AND TRANSPORTATION NECESSARY FOR BLACKFEET RESERVATION APARTMENT COMPLEX IN ACCORDANCE WITH THE ATTACHED SCOPE OF WORK, SPECIFICATIONS, TECHNICAL PROVISIONS, DRAWING
ActiveThis is an Open End / Project Specific Agreement (E03483) between the Commonwealth of Pennsylvania, Department of Transportation (Engineering District 8-0) and HNTB Corporation. Executed on March 22, 2016, the agreement covers preliminary engineering, final design, and construction consultation/shop drawing reviews for the reconstruction of Interstate 83. The total maximum cost for the agreement is $35,000,000.00, and it is set to terminate on March 22, 2026. Work under this agreement will be initiated through individual Work Orders, each with its own stipulated maximum cost, all falling within the overarching agreement maximum.
Effective Date
Mar 22, 2016
Expires
Effective: Mar 22, 2016
This is an Open End / Project Specific Agreement (E03483) between the Commonwealth of Pennsylvania, Department of Transportation (Engineering District 8-0) and HNTB Corporation. Executed on March 22, 2016, the agreement covers preliminary engineering, final design, and construction consultation/shop drawing reviews for the reconstruction of Interstate 83. The total maximum cost for the agreement is $35,000,000.00, and it is set to terminate on March 22, 2026. Work under this agreement will be initiated through individual Work Orders, each with its own stipulated maximum cost, all falling within the overarching agreement maximum.
ActiveTHE SCOPE OF THIS EFFORT IS TO PROVIDE ALL MANAGEMENT, LABOR AND SUPERVISION TO ACCOMPLISH THE DESIGN OF THE B198 BOILER HOUSE. CONTRACTOR TO PROVIDE 100% DESIGN DRAWING AND DETAIL SPECIFICATIONS PACKAGE.
Effective Date
Aug 15, 2025
Expires
Effective: Aug 15, 2025
THE SCOPE OF THIS EFFORT IS TO PROVIDE ALL MANAGEMENT, LABOR AND SUPERVISION TO ACCOMPLISH THE DESIGN OF THE B198 BOILER HOUSE. CONTRACTOR TO PROVIDE 100% DESIGN DRAWING AND DETAIL SPECIFICATIONS PACKAGE.
ActiveSee who's winning contracts, track spending trends, and identify your best opportunities before your competition.
Schedule Your Demo →Premium
Clean & enrich your CRM automatically
Premium
Get complete source documentation & analysis