Discover Opportunities months before the RFP drops
Learn more →In general, the work consists of: removing a bridge over a waterway, shoulder widening, guardrail, sheet pile walls, riprap, base aggregate path, and other incidentals required to complete the work.
Posted Date
Dec 9, 2025
Due Date
Jan 22, 2026
Release: Dec 9, 2025
Close: Jan 22, 2026
In general, the work consists of: removing a bridge over a waterway, shoulder widening, guardrail, sheet pile walls, riprap, base aggregate path, and other incidentals required to complete the work.
AvailableWork consists of a new 12,040 SF equipment storage building. Site work to include concrete aprons plus additional gravel and asphalt drive lanes for perimeter building access.
Posted Date
Sep 19, 2024
Due Date
Feb 25, 2026
Release: Sep 19, 2024
Close: Feb 25, 2026
Work consists of a new 12,040 SF equipment storage building. Site work to include concrete aprons plus additional gravel and asphalt drive lanes for perimeter building access.
AvailableIn general, the work consists of: Interior renovation to 5,800 SF on the 7th Floor north and south wings of the building. Work includes demolition of drywall partitions with doors and hollow metal frames, removal and reinstallation of plastic laminate casework with modifications, acoustic ceiling system modifications to accommodate new layout and access work above ceiling. Partitions are metal stud and drywall with wood doors in hollow metal frames with glass lites. Finish work includes wall base, carpet tiles, corner guards, casework modifications, and ceiling tiles. Electrical removal and installation of power and data sensors to accommodate renovation layout. Ceiling work includes removal and reinstallation or new light fixtures, exit lights, occupancy sensors, fire alarms, smoke detectors. Mechanical work includes duct and piping modifications, new VAVs equipment, relocation or new supply diffusers and return grilles. Fire protection work is piping modifications, removal and relocation of sprinkler heads, new sprinkler heads to accommodate renovation layout.
Posted Date
Dec 9, 2025
Due Date
Jan 27, 2026
Release: Dec 9, 2025
Close: Jan 27, 2026
In general, the work consists of: Interior renovation to 5,800 SF on the 7th Floor north and south wings of the building. Work includes demolition of drywall partitions with doors and hollow metal frames, removal and reinstallation of plastic laminate casework with modifications, acoustic ceiling system modifications to accommodate new layout and access work above ceiling. Partitions are metal stud and drywall with wood doors in hollow metal frames with glass lites. Finish work includes wall base, carpet tiles, corner guards, casework modifications, and ceiling tiles. Electrical removal and installation of power and data sensors to accommodate renovation layout. Ceiling work includes removal and reinstallation or new light fixtures, exit lights, occupancy sensors, fire alarms, smoke detectors. Mechanical work includes duct and piping modifications, new VAVs equipment, relocation or new supply diffusers and return grilles. Fire protection work is piping modifications, removal and relocation of sprinkler heads, new sprinkler heads to accommodate renovation layout.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis