Discover Opportunities months before the RFP drops
Learn more →Project includes architectural, mechanical, and electrical modifications. The existing dechlorination building is to be demolished; new chemical dosing pumps and tanks are to be installed; structural and electrical modifications are to accompany the installation of a new uv disinfection system in the existing uv disinfection/effluent channel; new rotary lobe sludge transfer pumps are to be installed to replace the existing progressive cavity pumps. See outside link.
Posted Date
Nov 3, 2025
Due Date
Dec 16, 2025
Release: Nov 3, 2025
Close: Dec 16, 2025
Project includes architectural, mechanical, and electrical modifications. The existing dechlorination building is to be demolished; new chemical dosing pumps and tanks are to be installed; structural and electrical modifications are to accompany the installation of a new uv disinfection system in the existing uv disinfection/effluent channel; new rotary lobe sludge transfer pumps are to be installed to replace the existing progressive cavity pumps. See outside link.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis