Discover Opportunities months before the RFP drops
Learn more →The scope of work includes removal and disposal of the existing cooling tower, all necessary structural and mechanical prep, installation of the new cooling tower, associated piping, electrical connections, and all required startup and testing.
Posted Date
-
Due Date
Dec 19, 2025
Release: -
Close: Dec 19, 2025
The scope of work includes removal and disposal of the existing cooling tower, all necessary structural and mechanical prep, installation of the new cooling tower, associated piping, electrical connections, and all required startup and testing.
AvailableWork generally includes asphalt paving, asphalt color coat, concrete paving, integral curb at walk, curb at playground, poured-in-place surfacing, chainlink fence, ornamental aluminum fence, playground equipment, picnic shelter, shade sail, bench, picnic table, playground underdrainage, drain cleanout, drinking fountain, backflow preventer, shade trees, shrubs, perennials, and lawn restoration.
Posted Date
Apr 11, 2025
Due Date
May 1, 2025
Release: Apr 11, 2025
Close: May 1, 2025
Work generally includes asphalt paving, asphalt color coat, concrete paving, integral curb at walk, curb at playground, poured-in-place surfacing, chainlink fence, ornamental aluminum fence, playground equipment, picnic shelter, shade sail, bench, picnic table, playground underdrainage, drain cleanout, drinking fountain, backflow preventer, shade trees, shrubs, perennials, and lawn restoration.
The scope of work includes patching and crack filling, seal coating, and striping two parking lots.
Posted Date
Jan 13, 2025
Due Date
Apr 7, 2025
Release: Jan 13, 2025
Close: Apr 7, 2025
The scope of work includes patching and crack filling, seal coating, and striping two parking lots.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis