Discover Opportunities months before the RFP drops
Learn more →Procurement of construction services for two projects: Contract #2 involves site development and installation of a 122,000-gallon water storage tank with appurtenances, and Contract #3 involves installation of approximately 2,950 LF of 8" PVC water line and related appurtenances.
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
Procurement of construction services for two projects: Contract #2 involves site development and installation of a 122,000-gallon water storage tank with appurtenances, and Contract #3 involves installation of approximately 2,950 LF of 8" PVC water line and related appurtenances.
AvailableProposed project consists of approx., 2,950 LF of 8" PVC water line, 40 LF of 8" road bore with 16" steel casing, two (2) 8 M.Jt. Gate valve with box and lid, two (2) 6" M. Jt. gate valve with box and lid, one (1) 4" compound meter setting with vault, three water mainline tie-ins and all other necessary appurtenances.
Posted Date
Nov 21, 2025
Due Date
Dec 18, 2025
Release: Nov 21, 2025
Close: Dec 18, 2025
Proposed project consists of approx., 2,950 LF of 8" PVC water line, 40 LF of 8" road bore with 16" steel casing, two (2) 8 M.Jt. Gate valve with box and lid, two (2) 6" M. Jt. gate valve with box and lid, one (1) 4" compound meter setting with vault, three water mainline tie-ins and all other necessary appurtenances.
AvailableWork consists of approx 2,950 LF of 8" pvc water line, 40 LF of 8" road bore with 16" steel casing, two (2) 8" m. Jt. Gate valve with box and lid, two (2) 6" m. Jt. Gate valve with box and lid, one (1) 4" compound meter setting with vault, three water mainline tie-ins and all other necessary appurtenances.
Posted Date
Nov 19, 2025
Due Date
Dec 18, 2025
Release: Nov 19, 2025
Close: Dec 18, 2025
Work consists of approx 2,950 LF of 8" pvc water line, 40 LF of 8" road bore with 16" steel casing, two (2) 8" m. Jt. Gate valve with box and lid, two (2) 6" m. Jt. Gate valve with box and lid, one (1) 4" compound meter setting with vault, three water mainline tie-ins and all other necessary appurtenances.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis