Discover Opportunities months before the RFP drops
Learn more →Construction of a 20'x30' Pump House Building (Steel, or Masonry with approval); Installation of 35,000-gallon storage tank(s),including concrete foundation; Installation of a 5,000-gallon hydro-pneumatic tank; Installation of a fully functional control system for pumps, solenoid valves, tanks, etc.; Installation of a fully functional electrical system for lighting, pumps, equipment, controls, etc.; See attached file.
Posted Date
Feb 28, 2025
Due Date
Apr 8, 2025
Release: Feb 28, 2025
Close: Apr 8, 2025
Construction of a 20'x30' Pump House Building (Steel, or Masonry with approval); Installation of 35,000-gallon storage tank(s),including concrete foundation; Installation of a 5,000-gallon hydro-pneumatic tank; Installation of a fully functional control system for pumps, solenoid valves, tanks, etc.; Installation of a fully functional electrical system for lighting, pumps, equipment, controls, etc.; See attached file.
Work includes approx 4,365 LF 8" PVC C900 DR-18 waterline; 120 LF 8" PVC C900 DR18 water line in 14" steel casing; 17,500 LF 8" PVC C900 DR18 water line. See attached file.
Posted Date
Feb 28, 2025
Due Date
Apr 8, 2025
Release: Feb 28, 2025
Close: Apr 8, 2025
Work includes approx 4,365 LF 8" PVC C900 DR-18 waterline; 120 LF 8" PVC C900 DR18 water line in 14" steel casing; 17,500 LF 8" PVC C900 DR18 water line. See attached file.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis