Discover Opportunities months before the RFP drops
Learn more →Replacement of the existing exterior brick veneer with a new cladding system and replacement of windows within the brick portions of the walls.
Posted Date
Oct 22, 2025
Due Date
Nov 12, 2025
Release: Oct 22, 2025
Close: Nov 12, 2025
Replacement of the existing exterior brick veneer with a new cladding system and replacement of windows within the brick portions of the walls.
Work consists of replacement of the existing exterior brick veneer with a new cladding system and replacement of windows within the brick portions of the wall.
Posted Date
Oct 22, 2025
Due Date
Nov 13, 2025
Release: Oct 22, 2025
Close: Nov 13, 2025
Work consists of replacement of the existing exterior brick veneer with a new cladding system and replacement of windows within the brick portions of the wall.
Work includes remove and dispose of all ceramic tile flooring in the two bathrooms, and remove the tubs and showers and their associated plumbing as indicated in the drawings. Install new heat welded vinyl flooring with integral coves, and install new tubs and showers as indicated in the plans. Completely re-paint the bathrooms and replace the fans of each bathroom.
Posted Date
Apr 2, 2025
Due Date
Apr 18, 2025
Release: Apr 2, 2025
Close: Apr 18, 2025
Work includes remove and dispose of all ceramic tile flooring in the two bathrooms, and remove the tubs and showers and their associated plumbing as indicated in the drawings. Install new heat welded vinyl flooring with integral coves, and install new tubs and showers as indicated in the plans. Completely re-paint the bathrooms and replace the fans of each bathroom.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis