Discover Opportunities months before the RFP drops
Learn more →Project consists of draining, cleaning, blasting and recoating 3,500,000 million gallon steel reservoir tank interior; power wash, power tool clean, spot prime, and overcoating the tank exterior; installation of a fall protection device; coating and caulking of the concrete foundation; coating, sealing, and caulking of the exposed top, sides, and interior of the valve vault; overcoating piping within the valve vault; and miscellaneous signage.
Posted Date
Nov 20, 2025
Due Date
Dec 18, 2025
Release: Nov 20, 2025
Close: Dec 18, 2025
Project consists of draining, cleaning, blasting and recoating 3,500,000 million gallon steel reservoir tank interior; power wash, power tool clean, spot prime, and overcoating the tank exterior; installation of a fall protection device; coating and caulking of the concrete foundation; coating, sealing, and caulking of the exposed top, sides, and interior of the valve vault; overcoating piping within the valve vault; and miscellaneous signage.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis