Discover Opportunities months before the RFP drops
Learn more →Replacement of existing heating and ventilation systems including associated ductwork, louvers, and dampers for compliance with NFPA 820. Replacement of existing two dry pit submersible non-clog wastewater pumps including related valves, and appurtenances. Replacement of existing flow meter piping and instrumentation with new magnetic meter, related piping, valves, and appurtenances. Provision of temporary equipment, instruments, tools, and manpower to maintain proper ventilation and sewage pumping capacity of the facility.
Posted Date
Dec 9, 2025
Due Date
Jan 19, 2026
Release: Dec 9, 2025
Close: Jan 19, 2026
Replacement of existing heating and ventilation systems including associated ductwork, louvers, and dampers for compliance with NFPA 820. Replacement of existing two dry pit submersible non-clog wastewater pumps including related valves, and appurtenances. Replacement of existing flow meter piping and instrumentation with new magnetic meter, related piping, valves, and appurtenances. Provision of temporary equipment, instruments, tools, and manpower to maintain proper ventilation and sewage pumping capacity of the facility.
AvailableReplace sanitary sewer main pipe 8”at 0’-12’ depth 948 lf, replace sanitary sewer main pipe 8” at 12’-20’ depth 280 lf, replace sewer house connection 4” by excavation; 0’-12’ depth 678 lf, replace sewer house connection 4” by excavation; 12’-20’ depth 59 lf, removal of lamphole and replace with standard manhole 4’ inside dia. with F&C up to 10’ depth 1 ea, locate existing buried manhole - in paced area 1 ea, reset/set manhole frame and cover 2 ea, furnish new 24”-36” manhole frame and cover 2 ea, cementitious reconstruction for 4’ inside diameter manhole 45 vf, see outside link.
Posted Date
Nov 14, 2025
Due Date
Dec 18, 2025
Release: Nov 14, 2025
Close: Dec 18, 2025
Replace sanitary sewer main pipe 8”at 0’-12’ depth 948 lf, replace sanitary sewer main pipe 8” at 12’-20’ depth 280 lf, replace sewer house connection 4” by excavation; 0’-12’ depth 678 lf, replace sewer house connection 4” by excavation; 12’-20’ depth 59 lf, removal of lamphole and replace with standard manhole 4’ inside dia. with F&C up to 10’ depth 1 ea, locate existing buried manhole - in paced area 1 ea, reset/set manhole frame and cover 2 ea, furnish new 24”-36” manhole frame and cover 2 ea, cementitious reconstruction for 4’ inside diameter manhole 45 vf, see outside link.
AvailableMill branch WWPS HVAC & odor control improvements.
Posted Date
Dec 8, 2025
Due Date
Jan 13, 2026
Release: Dec 8, 2025
Close: Jan 13, 2026
Mill branch WWPS HVAC & odor control improvements.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis