Discover Opportunities months before the RFP drops
Learn more →Greenwood County School District 51 requests sealed proposals for OM3 multimode fiber cabling upgrades between switch closets at three existing school campuses, including acquisition, staging, installation, configuration, and testing. A mandatory pre-bid walkthrough is noted, written questions are due by 2026-01-02, and bids are due January 21, 2026 at 11:00 AM.
Posted Date
Nov 19, 2025
Due Date
Jan 21, 2026
Release: Nov 19, 2025
Close: Jan 21, 2026
Greenwood County School District 51 requests sealed proposals for OM3 multimode fiber cabling upgrades between switch closets at three existing school campuses, including acquisition, staging, installation, configuration, and testing. A mandatory pre-bid walkthrough is noted, written questions are due by 2026-01-02, and bids are due January 21, 2026 at 11:00 AM.
AvailableGreenwood County School District 51 requests sealed proposals for OM3 multimode fiber cabling upgrades between switch closets at three existing school campuses, including acquisition, staging, installation, configuration, and testing. A mandatory pre-bid walkthrough is noted, written questions are due by 2026-01-02, and bids are due January 21, 2026 at 11:00 AM.
Posted Date
Nov 19, 2025
Due Date
Jan 21, 2026
Release: Nov 19, 2025
Close: Jan 21, 2026
Greenwood County School District 51 requests sealed proposals for OM3 multimode fiber cabling upgrades between switch closets at three existing school campuses, including acquisition, staging, installation, configuration, and testing. A mandatory pre-bid walkthrough is noted, written questions are due by 2026-01-02, and bids are due January 21, 2026 at 11:00 AM.
AvailableProvide all labor, equipment, and material necessary to remove, fabricate, and install +- 3,645 SF of new awnings along the front walkway of ware shoals primary school. New awning will consist of "w" pan style aluminum canopy resembling two newer versions on site. Posts shall consist of 3"x3" aluminum and water is to drain through posts.
Posted Date
Jul 28, 2025
Due Date
Aug 15, 2025
Release: Jul 28, 2025
Close: Aug 15, 2025
Provide all labor, equipment, and material necessary to remove, fabricate, and install +- 3,645 SF of new awnings along the front walkway of ware shoals primary school. New awning will consist of "w" pan style aluminum canopy resembling two newer versions on site. Posts shall consist of 3"x3" aluminum and water is to drain through posts.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis