Discover Opportunities months before the RFP drops
Learn more →Work includes construction of approx 20,000 LF of 36" and 30" ductile iron pipe water main, 120' of 42" steel cased jack and bore, 30 gate valves ranging in size from 6" to 36", six air release valve assemblies, 18 fire hydrants and connection to the water main leaving the new water treatment plant complete in place, pressure tested and disinfected, ready to operate, and any additional associated work.
Posted Date
Nov 19, 2025
Due Date
Dec 18, 2025
Release: Nov 19, 2025
Close: Dec 18, 2025
Work includes construction of approx 20,000 LF of 36" and 30" ductile iron pipe water main, 120' of 42" steel cased jack and bore, 30 gate valves ranging in size from 6" to 36", six air release valve assemblies, 18 fire hydrants and connection to the water main leaving the new water treatment plant complete in place, pressure tested and disinfected, ready to operate, and any additional associated work.
AvailableProvide construction services for large diameter transmission lines which will be used to transmit potable water.
Posted Date
Sep 9, 2025
Due Date
Oct 9, 2025
Release: Sep 9, 2025
Close: Oct 9, 2025
Provide construction services for large diameter transmission lines which will be used to transmit potable water.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis