Discover Opportunities months before the RFP drops
Learn more →Supply and installation of a prefabricated concrete toilet building (model: Ozark I type).
Posted Date
Dec 3, 2025
Due Date
Dec 15, 2025
Release: Dec 3, 2025
Close: Dec 15, 2025
Supply and installation of a prefabricated concrete toilet building (model: Ozark I type).
AvailableWork includes 20,140 LF sediment barrier; 262 LF staked turbidity barrier- nylon reinforced PVC; 2 EA soil tracking prevention device; 30 ea inlet protection system; 14.6 AC clearing & grubbing; 44,489 cy regular excavation; 26,857 CY embankment; 1,370 SY optional base - graded aggregate, 18" for project 431883-6-52-01 (black base); 20,060 SY optional base group 6; 21,976 SY type b stabilization; 1,466 SY milling existing asphalt pavement, 3" avg depth; 2,296 tn superpave asphaltic conc, traffic b, pg76-22; 1,148 tn asphalt conrete friction course, traffic b, fc-12.5, pg 76-22; 10,542 LF concrete curb & gutter, type f. See outside link.
Posted Date
Nov 12, 2025
Due Date
Dec 17, 2025
Release: Nov 12, 2025
Close: Dec 17, 2025
Work includes 20,140 LF sediment barrier; 262 LF staked turbidity barrier- nylon reinforced PVC; 2 EA soil tracking prevention device; 30 ea inlet protection system; 14.6 AC clearing & grubbing; 44,489 cy regular excavation; 26,857 CY embankment; 1,370 SY optional base - graded aggregate, 18" for project 431883-6-52-01 (black base); 20,060 SY optional base group 6; 21,976 SY type b stabilization; 1,466 SY milling existing asphalt pavement, 3" avg depth; 2,296 tn superpave asphaltic conc, traffic b, pg76-22; 1,148 tn asphalt conrete friction course, traffic b, fc-12.5, pg 76-22; 10,542 LF concrete curb & gutter, type f. See outside link.
AvailableRelease: Nov 19, 2025
Close: Dec 10, 2025
Provide CEI services.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis