Discover Opportunities months before the RFP drops
Learn more →The proposed work includes the cleaning and televising 19,769 LF of sewers, visual inspection of 130 manholes, and cut protruding laterals and/or roots; reports documenting the inspections performed and deficiencies observed shall be provided to the Village for consideration of needed repairs as part of future work.
Posted Date
Dec 17, 2025
Due Date
Jan 6, 2026
Release: Dec 17, 2025
Close: Jan 6, 2026
The proposed work includes the cleaning and televising 19,769 LF of sewers, visual inspection of 130 manholes, and cut protruding laterals and/or roots; reports documenting the inspections performed and deficiencies observed shall be provided to the Village for consideration of needed repairs as part of future work.
AvailableWork includes upgrades to standby generators.
Posted Date
Oct 1, 2025
Due Date
Oct 14, 2025
Release: Oct 1, 2025
Close: Oct 14, 2025
Work includes upgrades to standby generators.
Work include flow meter installation. includes reconfiguration of existing piping in drywells and the installation of flow meters within two wastewater pump stations
Posted Date
Jul 10, 2025
Due Date
Jul 24, 2025
Release: Jul 10, 2025
Close: Jul 24, 2025
Work include flow meter installation. includes reconfiguration of existing piping in drywells and the installation of flow meters within two wastewater pump stations
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis