Discover Opportunities months before the RFP drops
Learn more →Provide the village with phase iii construction engineering services for the first street resurfacing project.
Posted Date
Nov 28, 2025
Due Date
Dec 12, 2025
Release: Nov 28, 2025
Close: Dec 12, 2025
Provide the village with phase iii construction engineering services for the first street resurfacing project.
HMA milling, pavement patching, HMA resurfacing, combination curb and gutter removal and replacement, sidewalk removal and replacement (ADA compliant), structure adjustments, parkway restoration, street maintenance, and miscellaneous items of work.
Posted Date
May 27, 2025
Due Date
Jun 10, 2025
Release: May 27, 2025
Close: Jun 10, 2025
HMA milling, pavement patching, HMA resurfacing, combination curb and gutter removal and replacement, sidewalk removal and replacement (ADA compliant), structure adjustments, parkway restoration, street maintenance, and miscellaneous items of work.
Work includes full actuated cabinet and controller, concrete foundations, underground conduit, electric cable in conduit, traffic signal post, mast arm assembly and pole, traffic signal heads, service installation-ground mounted, and pavement markings.
Posted Date
May 1, 2025
Due Date
May 13, 2025
Release: May 1, 2025
Close: May 13, 2025
Work includes full actuated cabinet and controller, concrete foundations, underground conduit, electric cable in conduit, traffic signal post, mast arm assembly and pole, traffic signal heads, service installation-ground mounted, and pavement markings.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis