Discover Opportunities months before the RFP drops
Learn more →Work includes park shelter.
Posted Date
Dec 12, 2025
Due Date
Jan 16, 2026
Release: Dec 12, 2025
Close: Jan 16, 2026
Work includes park shelter.
AvailableCurb & gutter: 480 LF of 24" curb and gutter, option for additional 64 LF of curb and gutter.
Posted Date
Mar 26, 2025
Due Date
Apr 24, 2025
Release: Mar 26, 2025
Close: Apr 24, 2025
Curb & gutter: 480 LF of 24" curb and gutter, option for additional 64 LF of curb and gutter.
Asphalt paving: 235' X 20'. Option for additional 1,050 SF. Work to be done: Saw cut, pulverize, remove subsoils, widen and ensure 6" of compacted base course, finish shape base course. Furnish and install 2 1/2" of compacted hot mix asphalt. Contractors shall pulverize and rough grade to ensure proper stormwater drainage. Contractor is also responsible for all erosion control until street is paved.
Posted Date
Mar 26, 2025
Due Date
Apr 24, 2025
Release: Mar 26, 2025
Close: Apr 24, 2025
Asphalt paving: 235' X 20'. Option for additional 1,050 SF. Work to be done: Saw cut, pulverize, remove subsoils, widen and ensure 6" of compacted base course, finish shape base course. Furnish and install 2 1/2" of compacted hot mix asphalt. Contractors shall pulverize and rough grade to ensure proper stormwater drainage. Contractor is also responsible for all erosion control until street is paved.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis