Discover Opportunities months before the RFP drops
Learn more →The scope of work includes the demolition of the existing splash pad, underground vaults, and electrical panels. Following demolition, the area will be repurposed with new landscaping and irrigation, and will conclude with the restoration of select concrete statues.
Posted Date
Dec 2, 2025
Due Date
Jan 14, 2026
Release: Dec 2, 2025
Close: Jan 14, 2026
The scope of work includes the demolition of the existing splash pad, underground vaults, and electrical panels. Following demolition, the area will be repurposed with new landscaping and irrigation, and will conclude with the restoration of select concrete statues.
AvailableProject involves the rerouting of approx. 60 LF of 30" storm drain pipe. The existing pipe is located at a depth of approx. 10' (invert at the tie-in point). The new storm drain will be carefully installed to pass underneath existing sewer and electric lines, requiring specialized trenching and utility coordination to ensure safe and compliant construction.
Posted Date
-
Due Date
Sep 4, 2025
Release: -
Close: Sep 4, 2025
Project involves the rerouting of approx. 60 LF of 30" storm drain pipe. The existing pipe is located at a depth of approx. 10' (invert at the tie-in point). The new storm drain will be carefully installed to pass underneath existing sewer and electric lines, requiring specialized trenching and utility coordination to ensure safe and compliant construction.
Aquatic vegetation maintenance services.
Posted Date
Jul 25, 2025
Due Date
Aug 27, 2025
Release: Jul 25, 2025
Close: Aug 27, 2025
Aquatic vegetation maintenance services.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis