Discover Opportunities months before the RFP drops
Learn more →Seeking consultants with expertise in gas and electric aggregation programs.
Posted Date
Dec 4, 2025
Due Date
Dec 29, 2025
Release: Dec 4, 2025
Close: Dec 29, 2025
Seeking consultants with expertise in gas and electric aggregation programs.
AvailableWork includes 6,500 SY pavement planing; 590 GAL tack coat (0.09 GAL/SY); 360 CY asphalt concrete surface course, type 1, pg 64-22; 9 EA manhole adjusted to grade; 9 EA catch basin adjusted to grade; 40 LF work zone crosswalk line, class iii; 15 LF removal of pavement marking, 24"; 220 LF crosswalk line; 42 LF parking lot stall marking, white, 4"; 27 LF crosswalk line, as per plan, high skid resistant preformed marking material, b90; 125 CY partial depth pavement repair; 9 CY asphalt concrete surface course.
Posted Date
May 28, 2025
Due Date
Jun 12, 2025
Release: May 28, 2025
Close: Jun 12, 2025
Work includes 6,500 SY pavement planing; 590 GAL tack coat (0.09 GAL/SY); 360 CY asphalt concrete surface course, type 1, pg 64-22; 9 EA manhole adjusted to grade; 9 EA catch basin adjusted to grade; 40 LF work zone crosswalk line, class iii; 15 LF removal of pavement marking, 24"; 220 LF crosswalk line; 42 LF parking lot stall marking, white, 4"; 27 LF crosswalk line, as per plan, high skid resistant preformed marking material, b90; 125 CY partial depth pavement repair; 9 CY asphalt concrete surface course.
Project consist of development of a vacant lot into a multi-use trail and parking lot. A new driveway will be installed along east main street and a new shelter building will be constructed. Stormwater management measures will be installed via a bioretention basin. See attached file.
Posted Date
Jul 11, 2024
Due Date
Aug 1, 2024
Release: Jul 11, 2024
Close: Aug 1, 2024
Project consist of development of a vacant lot into a multi-use trail and parking lot. A new driveway will be installed along east main street and a new shelter building will be constructed. Stormwater management measures will be installed via a bioretention basin. See attached file.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis