Learn more →Provide storm sewer, water main, sanitary lateral and roadway improvements. This work includes but isn't limited to storm sewer, watermain, and sanitary lateral replacement, unclassified excavation, base construction, curb and gutter, concrete driveways, concrete sidewalks, asphalt paving, and restoration.
Posted Date
Dec 4, 2025
Due Date
Dec 18, 2025
Release: Dec 4, 2025
Close: Dec 18, 2025
Provide storm sewer, water main, sanitary lateral and roadway improvements. This work includes but isn't limited to storm sewer, watermain, and sanitary lateral replacement, unclassified excavation, base construction, curb and gutter, concrete driveways, concrete sidewalks, asphalt paving, and restoration.
AvailableProject involves but is not limited to, the following items and their related appurtenances: replacement of an existing engine generator and automatic transfer switch, and associated power and control wiring.
Posted Date
Oct 2, 2025
Due Date
Oct 23, 2025
Release: Oct 2, 2025
Close: Oct 23, 2025
Project involves but is not limited to, the following items and their related appurtenances: replacement of an existing engine generator and automatic transfer switch, and associated power and control wiring.
Reconstruction of indeterminate amounts of 4” concrete sidewalk; indeterminate amounts of 6” concrete sidewalk; topsoil, seed and mulch restoration (Approximately 4,500 SF of total concrete sidewalk). Said work shall depend upon abutting property owner non-compliance with the Village Orders to replace structurally deficient sidewalk. Property owners are given twenty (20) days to comply with said order.
Posted Date
Jul 28, 2025
Due Date
Aug 12, 2025
Release: Jul 28, 2025
Close: Aug 12, 2025
Reconstruction of indeterminate amounts of 4” concrete sidewalk; indeterminate amounts of 6” concrete sidewalk; topsoil, seed and mulch restoration (Approximately 4,500 SF of total concrete sidewalk). Said work shall depend upon abutting property owner non-compliance with the Village Orders to replace structurally deficient sidewalk. Property owners are given twenty (20) days to comply with said order.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis