Discover Opportunities months before the RFP drops
Learn more →Project scope is the full replacement of lead service lines from the water main through to the interior of the building or from the existing b-box, including connection to the water meter as identified. Work includes complete connection of the new service line, disconnection of the old lead service line and associated site restoration.
Posted Date
Nov 18, 2025
Due Date
Jan 7, 2026
Release: Nov 18, 2025
Close: Jan 7, 2026
Project scope is the full replacement of lead service lines from the water main through to the interior of the building or from the existing b-box, including connection to the water meter as identified. Work includes complete connection of the new service line, disconnection of the old lead service line and associated site restoration.
AvailableWork consists of PCC sidewalk, carriage walks, curb and gutter removal and replacement, and detectable warnings.
Posted Date
Sep 29, 2025
Due Date
Oct 14, 2025
Release: Sep 29, 2025
Close: Oct 14, 2025
Work consists of PCC sidewalk, carriage walks, curb and gutter removal and replacement, and detectable warnings.
The proposed work on the alley includes Portland Cement Concrete Pavement, pavers, subbase granular material, storm sewer and drainage structures, driveway removal and replacement, curb and gutter removal and replacement, and PCC sidewalk.
Posted Date
Feb 12, 2025
Due Date
Feb 26, 2025
Release: Feb 12, 2025
Close: Feb 26, 2025
The proposed work on the alley includes Portland Cement Concrete Pavement, pavers, subbase granular material, storm sewer and drainage structures, driveway removal and replacement, curb and gutter removal and replacement, and PCC sidewalk.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis