Discover Opportunities months before the RFP drops
Learn more →Project includes the following Work: Furnish all labor, materials, equipment, and incidentals required and construct the improvements in their entirety as shown on the Plans and as specified herein. The Work may include, but is not necessarily limited to, the following: 1.the installation of tank site RTUs, pump station RTUs, and solenoid control valve RTUs throughout the Clinton - Bee Branch Water Distribution System 2.the installation of new single phase electric services at various RTU sites as indicated 3.miscellaneous appurtenances 4.mobilization & demobilization 5.items of construction work and/or materials not specifically addressed herein, but nonetheless required for a complete, operating, and acceptable installation of the work, shall be considered subsidiary to the lump sum bid item, and the cost thereof shall be included therein.
Posted Date
Sep 5, 2025
Due Date
Jan 15, 2026
Release: Sep 5, 2025
Close: Jan 15, 2026
Project includes the following Work: Furnish all labor, materials, equipment, and incidentals required and construct the improvements in their entirety as shown on the Plans and as specified herein. The Work may include, but is not necessarily limited to, the following: 1.the installation of tank site RTUs, pump station RTUs, and solenoid control valve RTUs throughout the Clinton - Bee Branch Water Distribution System 2.the installation of new single phase electric services at various RTU sites as indicated 3.miscellaneous appurtenances 4.mobilization & demobilization 5.items of construction work and/or materials not specifically addressed herein, but nonetheless required for a complete, operating, and acceptable installation of the work, shall be considered subsidiary to the lump sum bid item, and the cost thereof shall be included therein.
AvailableWork consists of installation of tank site RTUs, pump station RTUs, and solenoid control valve.
Posted Date
Apr 25, 2025
Due Date
May 29, 2025
Release: Apr 25, 2025
Close: May 29, 2025
Work consists of installation of tank site RTUs, pump station RTUs, and solenoid control valve.
Work consists of tank rehabilitations.
Posted Date
Apr 25, 2025
Due Date
May 29, 2025
Release: Apr 25, 2025
Close: May 29, 2025
Work consists of tank rehabilitations.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis