Learn more →Work includes rehabilitation of dam with 670 tons of riprap for wave protection and stilling basin repair; 145' of new 20" PVC principal spillway pipe with canopy inlet, new drainage diaphragm, and trash rack; seeding and mulching.
Posted Date
Jan 16, 2025
Due Date
Mar 12, 2025
Release: Jan 16, 2025
Close: Mar 12, 2025
Work includes rehabilitation of dam with 670 tons of riprap for wave protection and stilling basin repair; 145' of new 20" PVC principal spillway pipe with canopy inlet, new drainage diaphragm, and trash rack; seeding and mulching.