Learn more →Collection System Improvements including upgrades to the Waverly Vacuum Station, five (5) pump stations, 15 manholes, 118 vacuum valve pits, stream bank restoration, the construction of a new storage building, and related appurtenances. Rerouting an existing portion of force main and electrical service via the instaallation of approximately 1,200 LF of 2" PVC force main and 1,200 LF of 2" electrical conduit, tie-ins to the existing pump station’s discharge piping and an existing 10" force main including all necessary valves and fittings, electrical tie-ins to a new service drop and existing pump station control panel, and all necessary appurtenances for a complete and operational system.
Posted Date
Aug 27, 2025
Due Date
Oct 22, 2025
Release: Aug 27, 2025
Close: Oct 22, 2025
Collection System Improvements including upgrades to the Waverly Vacuum Station, five (5) pump stations, 15 manholes, 118 vacuum valve pits, stream bank restoration, the construction of a new storage building, and related appurtenances. Rerouting an existing portion of force main and electrical service via the instaallation of approximately 1,200 LF of 2" PVC force main and 1,200 LF of 2" electrical conduit, tie-ins to the existing pump station’s discharge piping and an existing 10" force main including all necessary valves and fittings, electrical tie-ins to a new service drop and existing pump station control panel, and all necessary appurtenances for a complete and operational system.
Wastewater Treatment Plant Improvements including upgrades to the headworks, control building, sludge holding tank, sludge belt press, UV disinfection, and SBR aeration system; resurfacing of driveways and parking areas, and related appurtenances. 1 LS Mobilization/Demobilization; 1 LS Erosion and Sediment Control; 1 LS Pre-Construction Video Recording; 1 LS Remove and Replace Existing Headworks, Complete; 1 LS Control Building Upgrades, Complete; 1 LS Install Pre-Fabricated Removable Bridge Connecting SBR and Sludge Holding Tanks; 1 LS Remove & Replace Existing UV Disinfection Unit, Complete; 1 LS Remove & Replace Effluent Pump Station Variable Frequency Drive (VFD) Unit, Complete; 1 LS Sludge Digester Coarse Bubble Diffuser System, Complete with Two New Blower Units. See attached file.
Posted Date
Aug 27, 2025
Due Date
Oct 22, 2025
Release: Aug 27, 2025
Close: Oct 22, 2025
Wastewater Treatment Plant Improvements including upgrades to the headworks, control building, sludge holding tank, sludge belt press, UV disinfection, and SBR aeration system; resurfacing of driveways and parking areas, and related appurtenances. 1 LS Mobilization/Demobilization; 1 LS Erosion and Sediment Control; 1 LS Pre-Construction Video Recording; 1 LS Remove and Replace Existing Headworks, Complete; 1 LS Control Building Upgrades, Complete; 1 LS Install Pre-Fabricated Removable Bridge Connecting SBR and Sludge Holding Tanks; 1 LS Remove & Replace Existing UV Disinfection Unit, Complete; 1 LS Remove & Replace Effluent Pump Station Variable Frequency Drive (VFD) Unit, Complete; 1 LS Sludge Digester Coarse Bubble Diffuser System, Complete with Two New Blower Units. See attached file.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis