Discover Opportunities months before the RFP drops
Learn more →Removal of existing asphalt and existing concrete sidewalks and gutters in pipeline and service line paths. All removed materials will be replaced to match existing, Installation of new 12" C900 PVC water pipeline with all the valves and fittings, Installation of new 6" C900 PVC water pipeline with all the valves and fittings. Removal and replacement of existing fire hydrants. Clean, disinfect, and pressure test new water pipelines. Installation of a new altitude and pressure relief valve vault at the water tower and connect to waterline coming from City and connect to water tower. Reconnect existing service lines.
Posted Date
Nov 16, 2025
Due Date
Jan 15, 2026
Release: Nov 16, 2025
Close: Jan 15, 2026
Removal of existing asphalt and existing concrete sidewalks and gutters in pipeline and service line paths. All removed materials will be replaced to match existing, Installation of new 12" C900 PVC water pipeline with all the valves and fittings, Installation of new 6" C900 PVC water pipeline with all the valves and fittings. Removal and replacement of existing fire hydrants. Clean, disinfect, and pressure test new water pipelines. Installation of a new altitude and pressure relief valve vault at the water tower and connect to waterline coming from City and connect to water tower. Reconnect existing service lines.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis