Discover Opportunities months before the RFP drops
Learn more →Project consists of a new 120’ x 100’ pre-engineered metal hangar with 18’ x 90’ door, LED light fixtures, bathroom with utility hookups, gas heating, fence relocation, access control upgrades, and concrete pavement. Work includes, 2,190 CY of unsuitable excavation; 340 SY of 6: MDOT portland cement concrete pavement; 165 LF of chain link fence removal; 100 LF of chain link fence installation; 55 SY of 5" MDOT concrete sidewalk.
Posted Date
Aug 13, 2025
Due Date
Sep 5, 2025
Release: Aug 13, 2025
Close: Sep 5, 2025
Project consists of a new 120’ x 100’ pre-engineered metal hangar with 18’ x 90’ door, LED light fixtures, bathroom with utility hookups, gas heating, fence relocation, access control upgrades, and concrete pavement. Work includes, 2,190 CY of unsuitable excavation; 340 SY of 6: MDOT portland cement concrete pavement; 165 LF of chain link fence removal; 100 LF of chain link fence installation; 55 SY of 5" MDOT concrete sidewalk.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis