Discover Opportunities months before the RFP drops
Learn more →Work includes replacement of approx 1000 LF of 6" steel main with 8" ductile iron main on Turbine Way between Surge St and Aquifer Way.
Posted Date
Dec 9, 2025
Due Date
Jan 8, 2026
Release: Dec 9, 2025
Close: Jan 8, 2026
Work includes replacement of approx 1000 LF of 6" steel main with 8" ductile iron main on Turbine Way between Surge St and Aquifer Way.
AvailableWork includes construction of a second new pump station, site work, grading, yard piping, building, pumps, mechanical piping, HVAC, and electrical.
Posted Date
Nov 25, 2025
Due Date
Jan 15, 2026
Release: Nov 25, 2025
Close: Jan 15, 2026
Work includes construction of a second new pump station, site work, grading, yard piping, building, pumps, mechanical piping, HVAC, and electrical.
Availablework includes drill, construct, develop, and test pump one production well via the dual rotary air reverse drilling method.
Posted Date
Nov 25, 2025
Due Date
Dec 18, 2025
Release: Nov 25, 2025
Close: Dec 18, 2025
work includes drill, construct, develop, and test pump one production well via the dual rotary air reverse drilling method.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis