Discover Opportunities months before the RFP drops
Learn more →The selected Consultant shall: Review and synthesize relevant elements from the 2012 Facilities Master Plan; Facilitate limited stakeholder engagement sessions (executive leadership, Facilities Use Committee, Board); Analyze current campus layout and provide recommendations for long‑term site development; Produce updated conceptual drawings and phasing strategies; Deliver a concise, strategic‑level Facilities Master Plan Update and present findings to College leadership and the Board of Education.
Posted Date
May 6, 2025
Due Date
Jun 6, 2025
Release: May 6, 2025
Close: Jun 6, 2025
The selected Consultant shall: Review and synthesize relevant elements from the 2012 Facilities Master Plan; Facilitate limited stakeholder engagement sessions (executive leadership, Facilities Use Committee, Board); Analyze current campus layout and provide recommendations for long‑term site development; Produce updated conceptual drawings and phasing strategies; Deliver a concise, strategic‑level Facilities Master Plan Update and present findings to College leadership and the Board of Education.
Seeking to contract with a general contractor for the construction of a nursing-allied health professions center building. Consists of concrete foundations with steel structural frame, level 1 slab-ongrade floor, level 2 concrete filled steel deck floor and steel deck roof with concrete housekeeping pads at HVAC equipment. Consists of exterior and interior metal stud walls, aluminum-framed entrances and storefronts, Fiberglass reinforced concrete panels, brick masonry, EIFS, ACM panels, and TPO roofing. Interior consists of flush wood doors, misc. interior finishes, door hardware and specialties. Includes fire protection, elevator, plumbing, mechanical, electrical, communications and security. Includes utilities, planting, parking lot re-striping, and side walks.
Posted Date
Nov 20, 2024
Due Date
Jan 7, 2025
Release: Nov 20, 2024
Close: Jan 7, 2025
Seeking to contract with a general contractor for the construction of a nursing-allied health professions center building. Consists of concrete foundations with steel structural frame, level 1 slab-ongrade floor, level 2 concrete filled steel deck floor and steel deck roof with concrete housekeeping pads at HVAC equipment. Consists of exterior and interior metal stud walls, aluminum-framed entrances and storefronts, Fiberglass reinforced concrete panels, brick masonry, EIFS, ACM panels, and TPO roofing. Interior consists of flush wood doors, misc. interior finishes, door hardware and specialties. Includes fire protection, elevator, plumbing, mechanical, electrical, communications and security. Includes utilities, planting, parking lot re-striping, and side walks.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis