Discover Opportunities months before the RFP drops
Learn more →Demolition of a 1 1/2 story frame building, including removal and disposal of various site amenities at 316 Kresson Gibbsboro Road.
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
Demolition of a 1 1/2 story frame building, including removal and disposal of various site amenities at 316 Kresson Gibbsboro Road.
AvailableHVAC improvements for municipal offices. The project generally consists of removing six existing RTUs and related components while retaining most existing ductwork, then furnishing and installing six new RTUs with curb adapters and new rooftop gas piping. Work includes installing two new VAV boxes, supply and return ductwork, three exhaust fans, three transfer grilles, and ten new supply/return diffusers with volume dampers. All equipment will be integrated into the existing BMS, with full startup and testing, and electrical scope includes demolition and installation of all required power and control components. For the alternate bid, the contractor will partially demolish the existing HVAC system—including split condensers, VAVs, thermostats, and select ductwork and diffusers—and install two new mini-split units, eighteen VAV boxes with electric reheat, and associated ductwork modifications. A new Building Management System will integrate all HVAC equipment. The scope also includes allowances for ceiling tile removal and repair, unspecified work items, and electrical demolition and installation of cable, conduit, disconnects, and panelboards.
Posted Date
Dec 2, 2025
Due Date
Dec 19, 2025
Release: Dec 2, 2025
Close: Dec 19, 2025
HVAC improvements for municipal offices. The project generally consists of removing six existing RTUs and related components while retaining most existing ductwork, then furnishing and installing six new RTUs with curb adapters and new rooftop gas piping. Work includes installing two new VAV boxes, supply and return ductwork, three exhaust fans, three transfer grilles, and ten new supply/return diffusers with volume dampers. All equipment will be integrated into the existing BMS, with full startup and testing, and electrical scope includes demolition and installation of all required power and control components. For the alternate bid, the contractor will partially demolish the existing HVAC system—including split condensers, VAVs, thermostats, and select ductwork and diffusers—and install two new mini-split units, eighteen VAV boxes with electric reheat, and associated ductwork modifications. A new Building Management System will integrate all HVAC equipment. The scope also includes allowances for ceiling tile removal and repair, unspecified work items, and electrical demolition and installation of cable, conduit, disconnects, and panelboards.
AvailableBuilding demolition. The proposed work includes the demolition of a 1 1/2 story frame building and removal and disposal of various site amenities.
Posted Date
Dec 2, 2025
Due Date
Dec 18, 2025
Release: Dec 2, 2025
Close: Dec 18, 2025
Building demolition. The proposed work includes the demolition of a 1 1/2 story frame building and removal and disposal of various site amenities.
AvailableMore RFPs available with Premium →
Premium
Access the largest public sector contact database
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Get complete source documentation & analysis