Discover Opportunities months before the RFP drops
Learn more →The Township of Middletown (Bucks County, PA) is seeking contractors for traffic signal upgrades, including integration into a Unified Command Control System and replacement of controller units at six intersections. The project also involves adjusting clearance intervals at four intersections and installing a flashing yellow arrow at one, with work expected to be completed within 100 calendar days. Contractors must be pre-qualified with PennDOT and comply with PA Department of Labor and Industry prevailing wage determinations, with responses due by 2026-01-06.
Posted Date
Dec 5, 2025
Due Date
Jan 6, 2026
Release: Dec 5, 2025
Close: Jan 6, 2026
The Township of Middletown (Bucks County, PA) is seeking contractors for traffic signal upgrades, including integration into a Unified Command Control System and replacement of controller units at six intersections. The project also involves adjusting clearance intervals at four intersections and installing a flashing yellow arrow at one, with work expected to be completed within 100 calendar days. Contractors must be pre-qualified with PennDOT and comply with PA Department of Labor and Industry prevailing wage determinations, with responses due by 2026-01-06.
AvailableThe Township of Middletown (Bucks County, PA) is seeking contractors for traffic signal upgrades, including integration into a Unified Command Control System and replacement of controller units at six intersections. The project also involves adjusting clearance intervals at four intersections and installing a flashing yellow arrow at one, with work expected to be completed within 100 calendar days. Contractors must be pre-qualified with PennDOT and comply with PA Department of Labor and Industry prevailing wage determinations, with responses due by 2026-01-06.
Posted Date
Dec 5, 2025
Due Date
Jan 6, 2026
Release: Dec 5, 2025
Close: Jan 6, 2026
The Township of Middletown (Bucks County, PA) is seeking contractors for traffic signal upgrades, including integration into a Unified Command Control System and replacement of controller units at six intersections. The project also involves adjusting clearance intervals at four intersections and installing a flashing yellow arrow at one, with work expected to be completed within 100 calendar days. Contractors must be pre-qualified with PennDOT and comply with PA Department of Labor and Industry prevailing wage determinations, with responses due by 2026-01-06.
AvailableReplacing an existing Culvert. Currently, the existing culvert is in very poor condition and requires replacement. This project will focus on replacing this culvert with one more suitable for the flows of the stream as well as perform some streambank stabilization to minimize overflow around the stream.
Posted Date
Nov 19, 2025
Due Date
Dec 8, 2025
Release: Nov 19, 2025
Close: Dec 8, 2025
Replacing an existing Culvert. Currently, the existing culvert is in very poor condition and requires replacement. This project will focus on replacing this culvert with one more suitable for the flows of the stream as well as perform some streambank stabilization to minimize overflow around the stream.
More RFPs available with Premium →
Premium
Access the largest public sector contact database
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Get complete source documentation & analysis