Discover Opportunities months before the RFP drops
Learn more →Work consist of replacement of (3) fixed aerators.
Posted Date
Apr 4, 2025
Due Date
Apr 22, 2025
Release: Apr 4, 2025
Close: Apr 22, 2025
Work consist of replacement of (3) fixed aerators.
DESIGN/BUILD: Two-phase contract in the construction of a Police Department.
Posted Date
Dec 4, 2024
Due Date
Jan 31, 2025
Release: Dec 4, 2024
Close: Jan 31, 2025
DESIGN/BUILD: Two-phase contract in the construction of a Police Department.
Project consists of approx. 1,120 LF of 6" PVC force main sewer line, and one (1) 200 gpm submersible sewer pump station. The submersible sewer pump station will be equipped with a precast concrete wetwell, two pumps, diesel driven emergency generator, gravel access driveway, and necessary electrical equipment. A gravity sewer manhole will be constructed just outside the station to accept future flows from economic development projects.
Posted Date
Jan 13, 2025
Due Date
Mar 6, 2025
Release: Jan 13, 2025
Close: Mar 6, 2025
Project consists of approx. 1,120 LF of 6" PVC force main sewer line, and one (1) 200 gpm submersible sewer pump station. The submersible sewer pump station will be equipped with a precast concrete wetwell, two pumps, diesel driven emergency generator, gravel access driveway, and necessary electrical equipment. A gravity sewer manhole will be constructed just outside the station to accept future flows from economic development projects.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis