Discover Opportunities months before the RFP drops
Learn more →Work includes repair of the municipal salt shed, installing tin on building ends to bring up to code.
Posted Date
Dec 11, 2025
Due Date
Dec 15, 2025
Release: Dec 11, 2025
Close: Dec 15, 2025
Work includes repair of the municipal salt shed, installing tin on building ends to bring up to code.
Work consists of drywall repair, electrical work, flooring, wall tile, shelving/ cabinets, trim carpentry, door widening and install, wall bolstering for grab bars, painting, and installation of fixtures.
Posted Date
Dec 11, 2025
Due Date
Dec 29, 2025
Release: Dec 11, 2025
Close: Dec 29, 2025
Work consists of drywall repair, electrical work, flooring, wall tile, shelving/ cabinets, trim carpentry, door widening and install, wall bolstering for grab bars, painting, and installation of fixtures.
AvailableBids must include: design of code-compliant system, approval from General Engineering Company (GEC), installation of completed system, and testing/balancing system after install
Posted Date
May 29, 2025
Due Date
Jul 15, 2025
Release: May 29, 2025
Close: Jul 15, 2025
Bids must include: design of code-compliant system, approval from General Engineering Company (GEC), installation of completed system, and testing/balancing system after install
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis