Discover Opportunities months before the RFP drops
Learn more →The Town of Speedway and the Speedway Redevelopment Commission are soliciting proposals for redevelopment concepts for the Lenoir Site at 6017–6025 W. 16th Street. The RFP was issued November 14, 2025, with proposals due January 16, 2026.
Posted Date
Nov 14, 2025
Due Date
Jan 16, 2026
Release: Nov 14, 2025
Close: Jan 16, 2026
The Town of Speedway and the Speedway Redevelopment Commission are soliciting proposals for redevelopment concepts for the Lenoir Site at 6017–6025 W. 16th Street. The RFP was issued November 14, 2025, with proposals due January 16, 2026.
AvailableFor sale: 2009 Pierce Contender fire pumper VIN No.: 4P1CC01A69A009389 Mileage: 58,124. Other features: 1,000 GAl with 5,191 pump hours.
Posted Date
Jul 25, 2025
Due Date
Aug 8, 2025
Release: Jul 25, 2025
Close: Aug 8, 2025
For sale: 2009 Pierce Contender fire pumper VIN No.: 4P1CC01A69A009389 Mileage: 58,124. Other features: 1,000 GAl with 5,191 pump hours.
Project includes enhancements of an existing roundabout. Hardscape elements include finished concrete flatwork and C.I.P foundations for various site elements. Softscape includes sculpted berms, standard plantings, and sod. A stone veneer retaining wall encompasses much of the roundabout. Metal fabrication is not in this contract, but will need to be coordinated with the company noted in the specifications. Lighting is shown for the metal letters and will be installed as part of this contract. Lighting for the perforated panels is not included in this contract, but installation of electrical components and wiring necessary to power the lights is included. Refer to contract documents. See outside link.
Posted Date
-
Due Date
May 13, 2025
Release: -
Close: May 13, 2025
Project includes enhancements of an existing roundabout. Hardscape elements include finished concrete flatwork and C.I.P foundations for various site elements. Softscape includes sculpted berms, standard plantings, and sod. A stone veneer retaining wall encompasses much of the roundabout. Metal fabrication is not in this contract, but will need to be coordinated with the company noted in the specifications. Lighting is shown for the metal letters and will be installed as part of this contract. Lighting for the perforated panels is not included in this contract, but installation of electrical components and wiring necessary to power the lights is included. Refer to contract documents. See outside link.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis