Discover Opportunities months before the RFP drops
Learn more →Work includes 1,800 LF of install trench excavation and safety plan and all related work; 1,800 LF of install 6" C900 DR18 PVC water line (open cut), including backfill, marking tape, tracer wire, test stations, fittings and all related work; 3 EA of install 6" existing waterline reconnection, including 6"x6" tapping sleeve, gate valve and fittings and all related work; see attached files.
Posted Date
Dec 6, 2025
Due Date
Jan 15, 2026
Release: Dec 6, 2025
Close: Jan 15, 2026
Work includes 1,800 LF of install trench excavation and safety plan and all related work; 1,800 LF of install 6" C900 DR18 PVC water line (open cut), including backfill, marking tape, tracer wire, test stations, fittings and all related work; 3 EA of install 6" existing waterline reconnection, including 6"x6" tapping sleeve, gate valve and fittings and all related work; see attached files.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis