Discover Opportunities months before the RFP drops
Learn more →1 new 210 gal. per minute (GPM) pump station with 2,750+ feet of 4" ceramic-epoxy coated dip force main, 8' dia. precast wet well, standby generator and all associated valves, controllers and appurtenances; 1 new 420 gal. per minute (GPM) pump station with 5,610+ feet of 8" HDPE and 30+ feet of 8" ceramic-epoxy coated ductile Iron force main, 530+ feet of 15" PVC gravity sewer, 8' dia. precast wet well, standby generator and all associated valves, controllers and appurtenances; and the upgrade of an existing pump station with new 700 GPM pumps, standby generator and all associated valves, controllers and appurtenances within the existing wet well.
Posted Date
Nov 18, 2025
Due Date
Dec 22, 2025
Release: Nov 18, 2025
Close: Dec 22, 2025
1 new 210 gal. per minute (GPM) pump station with 2,750+ feet of 4" ceramic-epoxy coated dip force main, 8' dia. precast wet well, standby generator and all associated valves, controllers and appurtenances; 1 new 420 gal. per minute (GPM) pump station with 5,610+ feet of 8" HDPE and 30+ feet of 8" ceramic-epoxy coated ductile Iron force main, 530+ feet of 15" PVC gravity sewer, 8' dia. precast wet well, standby generator and all associated valves, controllers and appurtenances; and the upgrade of an existing pump station with new 700 GPM pumps, standby generator and all associated valves, controllers and appurtenances within the existing wet well.
AvailableThe project will consist of dredging and maintaining existing wastewater storage lagoons to restore capacity for use as equalization. The bio-solids quantities that can be removed have been estimated to be as follows: east pond: 712,166 gallons; 5.1% solids for 156 tons dry weight west pond: 1,019,152 gallons; 5.3% solids for 232 tons dry weight additional information and details of sampling is found in appendix A of the bidding package.
Posted Date
Nov 17, 2025
Due Date
Dec 17, 2025
Release: Nov 17, 2025
Close: Dec 17, 2025
The project will consist of dredging and maintaining existing wastewater storage lagoons to restore capacity for use as equalization. The bio-solids quantities that can be removed have been estimated to be as follows: east pond: 712,166 gallons; 5.1% solids for 156 tons dry weight west pond: 1,019,152 gallons; 5.3% solids for 232 tons dry weight additional information and details of sampling is found in appendix A of the bidding package.
AvailableThe construction of a timber fishing pier and concrete path as shown on the construction drawings. The lake will be drained before the contractor s mobilization to the site. The fishing pier is constructed with 12" diameter timber piles, double 4x12 girders, 3x8 bracing, 2x6 ipe decking, and fully ipe railings.
Posted Date
Jul 27, 2024
Due Date
Aug 27, 2024
Release: Jul 27, 2024
Close: Aug 27, 2024
The construction of a timber fishing pier and concrete path as shown on the construction drawings. The lake will be drained before the contractor s mobilization to the site. The fishing pier is constructed with 12" diameter timber piles, double 4x12 girders, 3x8 bracing, 2x6 ipe decking, and fully ipe railings.
More RFPs available with Premium →
Premium
Access the largest public sector contact database
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Get complete source documentation & analysis