Discover Opportunities months before the RFP drops
Learn more →Provide municipal sewer system operation and maintenance services.
Posted Date
Nov 25, 2025
Due Date
Dec 30, 2025
Release: Nov 25, 2025
Close: Dec 30, 2025
Provide municipal sewer system operation and maintenance services.
AvailableConstruction of phase 2, consisting of 2,577', more or less, of new 12" dia sewer force main, and an additive alternate of an additional 500' of new 12" dia sewer force main. Work shall include but not be limited to materials and labor for installation of new pipe, fittings, staking, traffic control, erosion control, permitting, removal of portions of existing sewer force main as shown on the plans, ditch crossing, protection of existing utilities and culverts, coordination with utility companies as required, granular fill as needed for pipe bedding and other work.
Posted Date
Mar 13, 2025
Due Date
Apr 1, 2025
Release: Mar 13, 2025
Close: Apr 1, 2025
Construction of phase 2, consisting of 2,577', more or less, of new 12" dia sewer force main, and an additive alternate of an additional 500' of new 12" dia sewer force main. Work shall include but not be limited to materials and labor for installation of new pipe, fittings, staking, traffic control, erosion control, permitting, removal of portions of existing sewer force main as shown on the plans, ditch crossing, protection of existing utilities and culverts, coordination with utility companies as required, granular fill as needed for pipe bedding and other work.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis