Discover Opportunities months before the RFP drops
Learn more →Work includes approx 3,945 SY of pavement milling, 55 TN of hot mix wedging, 130 TN of bituminous base paving, and 535 TN of hot mix bituminous surface paving, 17 TN of #73 aggregate, traffic maintenance, and miscellaneous work to complete the project.
Posted Date
Dec 18, 2025
Due Date
Jan 5, 2026
Release: Dec 18, 2025
Close: Jan 5, 2026
Work includes approx 3,945 SY of pavement milling, 55 TN of hot mix wedging, 130 TN of bituminous base paving, and 535 TN of hot mix bituminous surface paving, 17 TN of #73 aggregate, traffic maintenance, and miscellaneous work to complete the project.
Availablework includes approx 100,000 GAL single pedestal steel storage tank, tank foundation, valve vault, piping and valves, painting, electrical, site work, removal of existing elevated storage tank, miscellaneous related work; 850 LF 6" water main by open cuty, install approx 115 LF 6" water main directional bore, install 1 tapping sleeve and valves, install 2 gate valves, install 1 new hydrant assembly, granular backfill, pavement repair, restoration, and miscellaneous work to complete the project. Replace filter media with new, install Omni Site alarm system at elevated tank, SCADA control system to replace existing. See outside link.
Posted Date
Jul 24, 2025
Due Date
Aug 28, 2025
Release: Jul 24, 2025
Close: Aug 28, 2025
work includes approx 100,000 GAL single pedestal steel storage tank, tank foundation, valve vault, piping and valves, painting, electrical, site work, removal of existing elevated storage tank, miscellaneous related work; 850 LF 6" water main by open cuty, install approx 115 LF 6" water main directional bore, install 1 tapping sleeve and valves, install 2 gate valves, install 1 new hydrant assembly, granular backfill, pavement repair, restoration, and miscellaneous work to complete the project. Replace filter media with new, install Omni Site alarm system at elevated tank, SCADA control system to replace existing. See outside link.
Work includes approx 9,180 SY of pavement milling, 515 SF of hot mix bituminous patching and 1,037 TN of hot mix bituminous surface paving, 46 TN of #73 aggregate, 60' of but joints, traffic maintenance, and miscellaneous work.
Posted Date
Apr 17, 2025
Due Date
May 5, 2025
Release: Apr 17, 2025
Close: May 5, 2025
Work includes approx 9,180 SY of pavement milling, 515 SF of hot mix bituminous patching and 1,037 TN of hot mix bituminous surface paving, 46 TN of #73 aggregate, 60' of but joints, traffic maintenance, and miscellaneous work.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis