Discover Opportunities months before the RFP drops
Learn more →Work includes complete restoration and replacement of the existing modified bitumen roofing systems on two existing industrial buildings.
Posted Date
Dec 7, 2025
Due Date
Jan 6, 2026
Release: Dec 7, 2025
Close: Jan 6, 2026
Work includes complete restoration and replacement of the existing modified bitumen roofing systems on two existing industrial buildings.
AvailableFurnish all labor, equipment and materials necessary to replace two (2) existing sulfuric acid bulk storage tanks and two (2) day tanks including level transmitters and probes for each tank associated with the nanofiltration (NF) treatment process at the Town’s Water Treatment Plant. Work includes, but is not limited to, replacement of: tanks; fill, transport, overflow and vent piping; electrical panels, conduits, and wires/cables; compressed air piping for the bulk acid storage tanks; and installation of new desiccant air dry systems for both the NF bulk acid storage tanks and the reverse osmosis (RO) treatment acid tanks; as well as all related components and appurtenances required for maintenance of water treatment plant operations and to provide a complete and operational system.
Posted Date
Nov 18, 2025
Due Date
Dec 16, 2025
Release: Nov 18, 2025
Close: Dec 16, 2025
Furnish all labor, equipment and materials necessary to replace two (2) existing sulfuric acid bulk storage tanks and two (2) day tanks including level transmitters and probes for each tank associated with the nanofiltration (NF) treatment process at the Town’s Water Treatment Plant. Work includes, but is not limited to, replacement of: tanks; fill, transport, overflow and vent piping; electrical panels, conduits, and wires/cables; compressed air piping for the bulk acid storage tanks; and installation of new desiccant air dry systems for both the NF bulk acid storage tanks and the reverse osmosis (RO) treatment acid tanks; as well as all related components and appurtenances required for maintenance of water treatment plant operations and to provide a complete and operational system.
AvailableThis project consists of but is not limited to, the milling and resurfacing of existing asphalt pavement, full depth roadway construction, reworking existing base, signing and pavement marking, concrete removal and installation, drainage improvements, ADA Accessibility construction, intersection improvements, surveying, landscaping, and record drawings. Contractors bidding this project shall be FDOT prequalified and all asphalt and concrete incorporated shall be obtained from an FDOT approved plant.
Posted Date
Nov 21, 2025
Due Date
Dec 23, 2025
Release: Nov 21, 2025
Close: Dec 23, 2025
This project consists of but is not limited to, the milling and resurfacing of existing asphalt pavement, full depth roadway construction, reworking existing base, signing and pavement marking, concrete removal and installation, drainage improvements, ADA Accessibility construction, intersection improvements, surveying, landscaping, and record drawings. Contractors bidding this project shall be FDOT prequalified and all asphalt and concrete incorporated shall be obtained from an FDOT approved plant.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis