Discover Opportunities months before the RFP drops
Learn more →Release: Nov 19, 2025
Close: Dec 19, 2025
Brownfields cleanup project.
AvailableWork includes pipe bursting 579 LF of 8" HDPE and 466 LF of 10" HDPE sewer lines. Cured In Place Pipe of 421 LF 8" Dia. Reconnection of 19 lateral connections, Structural manhole rehabilitation of 4 manholes totaling 27 vertical feet of lining, miscellaneous point repairs and all restoration.
Posted Date
Jul 10, 2025
Due Date
Aug 12, 2025
Release: Jul 10, 2025
Close: Aug 12, 2025
Work includes pipe bursting 579 LF of 8" HDPE and 466 LF of 10" HDPE sewer lines. Cured In Place Pipe of 421 LF 8" Dia. Reconnection of 19 lateral connections, Structural manhole rehabilitation of 4 manholes totaling 27 vertical feet of lining, miscellaneous point repairs and all restoration.
Work includes pipe bursting 2,701 LF of 8" HDPE and 659 LF of 10" HDPE sewer lines. Cured In Place Pipe of 1,507 LF of varied 8", 10" & 12" Dia. Reconnection of 18 lateral connections, Structural manhole rehabilitation of 29 manholes totaling 167 vertical feet of lining, miscellaneous point repairs and all restoration.
Posted Date
Jul 10, 2025
Due Date
Aug 12, 2025
Release: Jul 10, 2025
Close: Aug 12, 2025
Work includes pipe bursting 2,701 LF of 8" HDPE and 659 LF of 10" HDPE sewer lines. Cured In Place Pipe of 1,507 LF of varied 8", 10" & 12" Dia. Reconnection of 18 lateral connections, Structural manhole rehabilitation of 29 manholes totaling 167 vertical feet of lining, miscellaneous point repairs and all restoration.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis