Learn more →The Town of Fraser seeks a Construction Manager at Risk (CMAR) to provide pre-construction services and potentially construction services for a new Public Works Operations Facility that includes administration/maintenance buildings, a greenhouse, salt barn, fuel island, vehicle storage, heated storage, and a solar array. The CMAR must demonstrate relevant project delivery experience, safety and financial stability, and will provide estimating, scheduling, and value engineering during pre-construction.
Posted Date
Nov 19, 2025
Due Date
Dec 15, 2025
Release: Nov 19, 2025
Close: Dec 15, 2025
The Town of Fraser seeks a Construction Manager at Risk (CMAR) to provide pre-construction services and potentially construction services for a new Public Works Operations Facility that includes administration/maintenance buildings, a greenhouse, salt barn, fuel island, vehicle storage, heated storage, and a solar array. The CMAR must demonstrate relevant project delivery experience, safety and financial stability, and will provide estimating, scheduling, and value engineering during pre-construction.
AvailableThe work includes, but is not necessarily limited to, approx. 1 EA 8-inch Gate Valve (Buried); 6 EA 8-inch Ductile Iron Waterline Fittings (Buried); 2 EA Connection to Existing.
Posted Date
May 14, 2025
Due Date
Jun 6, 2025
Release: May 14, 2025
Close: Jun 6, 2025
The work includes, but is not necessarily limited to, approx. 1 EA 8-inch Gate Valve (Buried); 6 EA 8-inch Ductile Iron Waterline Fittings (Buried); 2 EA Connection to Existing.
Work consist of new water mains and valve replacements, new water mains include approx. 175 LF of 6" c900 PVC and 192 LF in a separate location of new 8" c-900 PVC water main, replacement of existing 8" tee and valves with new 8" cross and valves, and cut-in replacement of an existing 8" gate valve, includes four (4) 8" MJ gate valves, three (3) 6" DI waterline fittings, nine (9) 8" DI waterline fittings, plus associated fittings, hot taps, and valves at connections to existing distribution system, includes asphalt, concrete, and reseeding restoration of disturbed areas.
Posted Date
Mar 7, 2025
Due Date
Apr 3, 2025
Release: Mar 7, 2025
Close: Apr 3, 2025
Work consist of new water mains and valve replacements, new water mains include approx. 175 LF of 6" c900 PVC and 192 LF in a separate location of new 8" c-900 PVC water main, replacement of existing 8" tee and valves with new 8" cross and valves, and cut-in replacement of an existing 8" gate valve, includes four (4) 8" MJ gate valves, three (3) 6" DI waterline fittings, nine (9) 8" DI waterline fittings, plus associated fittings, hot taps, and valves at connections to existing distribution system, includes asphalt, concrete, and reseeding restoration of disturbed areas.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis