Discover Opportunities months before the RFP drops
Learn more →Remove existing pavement; Excavate 2’ of existing roadway gravel; Install 18" of Type D gravel, and 6" of Type A gravel on top; Ditch both sides of road to drain; Pavement is to match existing depth up to 4"; To be placed in 2 lifts.
Posted Date
Nov 13, 2025
Due Date
Dec 16, 2025
Release: Nov 13, 2025
Close: Dec 16, 2025
Remove existing pavement; Excavate 2’ of existing roadway gravel; Install 18" of Type D gravel, and 6" of Type A gravel on top; Ditch both sides of road to drain; Pavement is to match existing depth up to 4"; To be placed in 2 lifts.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis