Discover Opportunities months before the RFP drops
Learn more →Creek farm road, bridge 10 project for resetting temporary bridge, removal of existing bridge and installing an aluminum box culvert, with associated roadway improvements.
Posted Date
Nov 6, 2025
Due Date
Dec 11, 2025
Release: Nov 6, 2025
Close: Dec 11, 2025
Creek farm road, bridge 10 project for resetting temporary bridge, removal of existing bridge and installing an aluminum box culvert, with associated roadway improvements.
selling the following surplus vehicles and equipment: Vehicle #1 - 2022 Dodge Durango, V6, Automatic, AWD, 74,963 miles, VIN 1C4RDJFG2NC184790; Vehicle #2 - 2016 Chevy Impala, V6, Automatic, 101,097 miles, VIN 2G1WD5E30G1106678; Vehicle #3 - 2016 Chevy Impala, V6, Automatic, 98,092 miles, VIN 2G1WD5E3XG1106364; Vehicle #4 - 2013 Chevy 2500 Crew Cab, V8, Automatic, 4x4, spray in bedliner and tonneau cover, 71,002 miles, VIN 1GC1KVCG0DF233416; Equipment #5 - Coats Rim Clamp 5065EX Tire Changer; Equipment #6 - Coats 1050 Direct Drive Tire Balancer, needs repairs.
Posted Date
Oct 8, 2025
Due Date
Oct 21, 2025
Release: Oct 8, 2025
Close: Oct 21, 2025
selling the following surplus vehicles and equipment: Vehicle #1 - 2022 Dodge Durango, V6, Automatic, AWD, 74,963 miles, VIN 1C4RDJFG2NC184790; Vehicle #2 - 2016 Chevy Impala, V6, Automatic, 101,097 miles, VIN 2G1WD5E30G1106678; Vehicle #3 - 2016 Chevy Impala, V6, Automatic, 98,092 miles, VIN 2G1WD5E3XG1106364; Vehicle #4 - 2013 Chevy 2500 Crew Cab, V8, Automatic, 4x4, spray in bedliner and tonneau cover, 71,002 miles, VIN 1GC1KVCG0DF233416; Equipment #5 - Coats Rim Clamp 5065EX Tire Changer; Equipment #6 - Coats 1050 Direct Drive Tire Balancer, needs repairs.
HVAC services and preventative maintenance agreement for the Colchester Police Station. Scope of work: Mitsubishi Split Systems: Replace/wash air filters, inspect evaporator and condenser coils (brush down as necessary), clean and inspect drain pan and condensate line, inspect motors and blowers (lubricate as needed), check electrical connections (tighten as necessary), inspect contactors, test operation of compressor checking operating pressures, check motor amps and note temperature change across unit (Delta T). Replace air filter and wash condenser coils with water. See attached file.
Posted Date
Sep 22, 2025
Due Date
Oct 16, 2025
Release: Sep 22, 2025
Close: Oct 16, 2025
HVAC services and preventative maintenance agreement for the Colchester Police Station. Scope of work: Mitsubishi Split Systems: Replace/wash air filters, inspect evaporator and condenser coils (brush down as necessary), clean and inspect drain pan and condensate line, inspect motors and blowers (lubricate as needed), check electrical connections (tighten as necessary), inspect contactors, test operation of compressor checking operating pressures, check motor amps and note temperature change across unit (Delta T). Replace air filter and wash condenser coils with water. See attached file.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis