Discover Opportunities months before the RFP drops
Learn more →This project includes, but is not limited to, parking lot reconstruction, pavement preservation, sidewalk removal and replacement, concrete slab lift and under sealing, swppp installations, and traffic control. Mobilization bonds & insurance; dvd of row pre-construction & post construction site conditions for total project; implement traffic safety plan; prepare swppp and obtain tceq permit; administer swppp; hmac saw cut; remove & dispose up to 13" depth asphalt/base; moisture conditioned subgrade; furnish & install tensar tx 140 geogrid; furnish, place, & compact crushed limestone base material (11" depth), txdot item 247, type a, grade 1-2 or better.
Posted Date
May 29, 2025
Due Date
Jun 18, 2025
Release: May 29, 2025
Close: Jun 18, 2025
This project includes, but is not limited to, parking lot reconstruction, pavement preservation, sidewalk removal and replacement, concrete slab lift and under sealing, swppp installations, and traffic control. Mobilization bonds & insurance; dvd of row pre-construction & post construction site conditions for total project; implement traffic safety plan; prepare swppp and obtain tceq permit; administer swppp; hmac saw cut; remove & dispose up to 13" depth asphalt/base; moisture conditioned subgrade; furnish & install tensar tx 140 geogrid; furnish, place, & compact crushed limestone base material (11" depth), txdot item 247, type a, grade 1-2 or better.
Release: Apr 30, 2025
Close: May 28, 2025
Provide campus food services.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis