Discover Opportunities months before the RFP drops
Learn more →Provide a mini split hvac system in the basement of the archives building. All labor materials and equipment required to perform the above-described work. 1 - new 3-ton outdoor mini split heat pump condensing unit 3- new 1-ton indoor wall hung fan coil units all required piping, wiring, and electrical work required to hook up the new equipment list warranty on parts for the new mini split equipment list warranty on all materials, equipment, and workmanship provided.
Posted Date
Dec 18, 2025
Due Date
Jan 2, 2026
Release: Dec 18, 2025
Close: Jan 2, 2026
Provide a mini split hvac system in the basement of the archives building. All labor materials and equipment required to perform the above-described work. 1 - new 3-ton outdoor mini split heat pump condensing unit 3- new 1-ton indoor wall hung fan coil units all required piping, wiring, and electrical work required to hook up the new equipment list warranty on parts for the new mini split equipment list warranty on all materials, equipment, and workmanship provided.
AvailableProvide mold remediation services.
Posted Date
Dec 18, 2025
Due Date
Jan 2, 2026
Release: Dec 18, 2025
Close: Jan 2, 2026
Provide mold remediation services.
AvailableReplace a deficient bridge with new single-span concrete box beam bridge.
Posted Date
Dec 19, 2024
Due Date
Jan 27, 2025
Release: Dec 19, 2024
Close: Jan 27, 2025
Replace a deficient bridge with new single-span concrete box beam bridge.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis