Learn more →Project will replace interior lighting fixtures, replace exterior lighting fixtures, and install lighting controls.
Posted Date
Dec 9, 2025
Due Date
Jan 21, 2026
Release: Dec 9, 2025
Close: Jan 21, 2026
Project will replace interior lighting fixtures, replace exterior lighting fixtures, and install lighting controls.
AvailableWork consists to renovate the first floor with a TI and elevator upgrade per project.
Posted Date
Dec 9, 2025
Due Date
Jan 6, 2026
Release: Dec 9, 2025
Close: Jan 6, 2026
Work consists to renovate the first floor with a TI and elevator upgrade per project.
AvailableThis Invitation for Bid (IFB) solicits contractors to remove and replace three chiller isolation valves, three primary chiller pumps, three secondary chiller pumps and associated hydronic piping, insulation, gauges, and condenser water t-strainer baskets at the Regional Justice Center central chiller plant. The scope also includes demolition and replacement work such as an overhead roll-up door, relocation of electrical conduit, and modification of light fixtures and mechanical ductwork; a pre-bid meeting and site walk are scheduled for October 15, 2025. Bids are due December 18, 2025, with bid opening to be held via Webex; documentation is hosted on the buyer-managed IonWave procurement site (link provided on the aggregator page).
Posted Date
Oct 8, 2025
Due Date
Dec 18, 2025
Release: Oct 8, 2025
Close: Dec 18, 2025
This Invitation for Bid (IFB) solicits contractors to remove and replace three chiller isolation valves, three primary chiller pumps, three secondary chiller pumps and associated hydronic piping, insulation, gauges, and condenser water t-strainer baskets at the Regional Justice Center central chiller plant. The scope also includes demolition and replacement work such as an overhead roll-up door, relocation of electrical conduit, and modification of light fixtures and mechanical ductwork; a pre-bid meeting and site walk are scheduled for October 15, 2025. Bids are due December 18, 2025, with bid opening to be held via Webex; documentation is hosted on the buyer-managed IonWave procurement site (link provided on the aggregator page).
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis