Discover Opportunities months before the RFP drops
Learn more →Project consists of regrading of Hannover Village Regional Detention pond, rehabilitation of storm sewer pipes, and installation of concrete pilot channel.
Posted Date
Nov 12, 2025
Due Date
Dec 3, 2025
Release: Nov 12, 2025
Close: Dec 3, 2025
Project consists of regrading of Hannover Village Regional Detention pond, rehabilitation of storm sewer pipes, and installation of concrete pilot channel.
Replacing the motor control center, autosensory control panel, new electrical, wiring, grounding, and controls.
Posted Date
Feb 17, 2025
Due Date
Mar 20, 2025
Release: Feb 17, 2025
Close: Mar 20, 2025
Replacing the motor control center, autosensory control panel, new electrical, wiring, grounding, and controls.
Work includes approx 160 LF of 10" C900 PVC waterline; 1 EA 8" gate valve with box; 150 LF of 1-1/4" HDG air piping from outside control room direct bury all depths, including bends, valves, fittings. See attached file.
Posted Date
Jan 10, 2025
Due Date
Feb 6, 2025
Release: Jan 10, 2025
Close: Feb 6, 2025
Work includes approx 160 LF of 10" C900 PVC waterline; 1 EA 8" gate valve with box; 150 LF of 1-1/4" HDG air piping from outside control room direct bury all depths, including bends, valves, fittings. See attached file.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis