Discover Opportunities months before the RFP drops
Learn more →Replacement of the pumping station including the installation of two new pumps and controls, grinder pit and valve vault, and new flowmeter and including piping, valves, and electrical work as shown on the drawings and as specified, and the replacement of the forcemain in the same trench. This includes bypass pumping and demolition of existing equipment.
Posted Date
Nov 10, 2025
Due Date
Dec 17, 2025
Release: Nov 10, 2025
Close: Dec 17, 2025
Replacement of the pumping station including the installation of two new pumps and controls, grinder pit and valve vault, and new flowmeter and including piping, valves, and electrical work as shown on the drawings and as specified, and the replacement of the forcemain in the same trench. This includes bypass pumping and demolition of existing equipment.
AvailableWork includes all material, labor, and equipment necessary for the installation of a new at grade storage tank, booster pump station, pumps, controls, yard piping, HVAC, plumbing, and electrical work.
Posted Date
May 6, 2025
Due Date
Aug 29, 2025
Release: May 6, 2025
Close: Aug 29, 2025
Work includes all material, labor, and equipment necessary for the installation of a new at grade storage tank, booster pump station, pumps, controls, yard piping, HVAC, plumbing, and electrical work.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis